Front and back of the engine complete and unpainted.
First spray of primer and the gaps between the blades look a little inconsistent.
After filling with Milliput Super Fine almost complete, need a little more filling.
Weapons bay under construction. The walls of the bay are from 1mm styrene and the raised milled sections from 0.5 x 0.5 square styrene. There is plenty more detail to add here.
No comments:
Post a Comment